Project Background

The rapid urban development has led to an increase in power demand in residential areas.

Project Challenges

• Overload of power distribution feeders
• Limited substation capacity
• Voltage instability

Solutions

We provided the following equipment:
• Ring Main Unit (RMU) ring network system
• KYN28 switchgear
• Box-type substation (YB system)

Project Achievements

• Stable voltage supply
• Optimized load distribution
• Scalable grid expansion